|
Repair of overhead lines with substitution of pole lines, affecting 3 garage tracks for EMB № 1,2,3 to repair hall for EMB rejoin Sofia engine depot”
|
| Investor: NRIC Client: Trans El Engineering – PM” Et Location: Region Sofia engine depot Period of realization: May, 2008 – June, 2008 Role of “Avis Engineering” Ltd.: Executive Nature of the works: - Dismantling of poles and foundations; - Assembly of poles and foundations. |