|
Client: Transstroy Varna PLC Location: railway track Voluyak – Kalotina west – Border Period of realization: June, 2005 – August, 2005 Role of “Avis Engineering” Ltd.: Executive on part Overhead lines on the following parts: “Station Dragoil” “Station Dragoil – Station Kalotina”, “Station Kalotina”, “Station Kalotina – Station Kalotina West”, “Station Kalotina West” Nature of the works: - Assembly of overhead lines.
Reference of the project look here: Reference1 and Reference2
|