“Reconstruction of railway track and traffic ways on “Hristo Botev” Blvd. section between “Maria Luiza” bld. and “Slivnitsa” Blvd.”
Investor: Sofia Municipality Client: „Building company – 13 Transstroy“JSC Location: Sofia Period of realization: September, 2008 – November, 2008 Role of “Avis Engineering” Ltd.: Executive Nature of the works: - Poles and foundations; - Overhead lines.