|
“Sulphurpurify installation – station TEP 3 – overhead lines”
|
| Investor: “Mini Maritsa – Istok” PLC Client: “Boneti” Ltd. Location: “EC Maritsa Istok 3” Period of realization: August, 2005 – November, 2005 Role of “Avis Engineering” Ltd. : Executive Nature of the works: - Assembly of poles and foundations; - Assembly of overhead lines. |