|
Investor: NRIC Client: “RVP – Koehne” JSC – Sofia Location: Three main rail line from km 56 +500 to km 59 +740 between stations: Dolno Kamartci - Mirkovo Period of realization: September, 2009 – April, 2010 Role of “Avis Engineering” Ltd.: Executive Nature of the works: - Reconstruction and modernization of overhead lines.
Reference of the project: Look here...
|