|
Investor: “Enel Maritsa Istok” Client: “Boneti” Location: “Enel Maritsa Istok” Period of realization: March, 2009 – June, 2009 Role of “Avis Engineering” Ltd. : Executive Nature of the works: - Construction of overhead lines – 1,65kV; - Dismantling of poles and foundations; - Assembly of poles and foundations; - Dismantling of overhead lines; - Assembly of overhead lines.
Reference of the project: Look here…
|